How to calculate the water content cement ratio
Answer Posted / toto1704
Thumb rule:
Water required = 28% wt. of cement + 4% wt. of aggregate
Water required = 30% wt. of cement + 5% wt. of aggregate
Is This Answer Correct ? | 4 Yes | 8 No |
Post New Answer View All Answers
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
How much quantity of cement Bag for block masonry (1:4) for 1 cu.m? Block size (150x200x400) Mortar Thickness 20mm
Why we provide hair pin for shed
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
What is difference between code and standard and specification?
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
Explain the Strength of brick?
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
Time required for curing of wall tiles before fixing
Form where IS456 is adopted in 1978?
What are the ingredients of pre-stressed concrete?
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
water leak detection system question & answer
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?