How to calculate the water content cement ratio
Answer Posted / toto1704
Thumb rule:
Water required = 28% wt. of cement + 4% wt. of aggregate
Water required = 30% wt. of cement + 5% wt. of aggregate
| Is This Answer Correct ? | 4 Yes | 8 No |
Post New Answer View All Answers
how to calculate load bearing column
For the construction project what capital cost has to be taken in consideration?
Name the main components of a cad gui?
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
Why the statue of liberty is made of copper?
Explain the different types of building contracts?
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
dialation means
How to calculate density of 40 mm coarse aggregate, in mixing ration 1:1.5:3? Please explain calculation for density
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'
can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?
The 4 main factors to start a construction project are––