Answer Posted / m.asif doulatshahi
we can not use the zero slump concrete because zero slump concrete is to match hard so it is not useballe concrete.
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
how to control PQI (Project Quality Index)
how to find out hard strata in bored pile when the DMC method adopted.
WHAT IS YOUR CURRENT SALARY
though u r a civil engineer, y r u interested in tcs???
give me the mix proportion for design mix concrete M 7.5 grade 1:4:8
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
How to find out slope footing concrete
pls tell me about method of cutting length of ties column
Describe the advantages and disadvantages of using plastic and timber fenders?
What is .Dwg?
what is difference between fluidity and workability also how palsticizer works
Reinforcement details at hinged joint
What is the purpose of Chipping in the heavy foundation?