What is difference between dc three point starter and dc four point starter?
Answer Posted / pritish
the difference between a 3 point and 4 point starter is, 4 point starter can be used for over load protection where as 3 point starter can not be used for over load protection and other difference is 4 point starter has 4 terminals and 3 point as three terminals.
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
What are the types of windings according to the construction?
surge tank, hrc fuse, earthing transformer, firm power objective type
Is it advantages of having star-delta vfd than normal star vfd , if yes why?
What is tan delta & PPM in transformer? and whats its IS value?
what is the need of starter in tube light and what type of starter is used in that?
th how could we differentiate between armoured copper and armoured aluminium cable what is the basic application? why we prefer the armoured copper as compared to armoured aluminium.
y we use neutral,all r told its used to for closed path..k its a just used to closed path,in a transmission line y we put same conductor used n both phase and neutral..if we use less than phase conductor in neutral mean we ll reduce cost its right r wrong..if we use mean any problem occur in transmission line..
how test transfomer(3 phase75kva) by megger
What is the difference between PLC and Embeded system
Distribution transformer we provided 2 separate earthing pit for Body and 2 separate earthing pit for neutral,we can not connect separate body earthing pit to other earthing pit but we do metal glanding in secondary side cable termination in both side, transformer and PCC panel (LT Panel), is this safe for transformer and other equipment?
why output is out of phase in case of common emitter?
What is fault clearing time for Current Limiting Moulded Case Circuit Breaker?.
How can we decide cable size from HT panel to Transformer? Please give you reply with some examples.
how to calculate the tarriff for an industry whose kva demand is 10 mva
what types of electrical & mechanical test conducted in switchyard?