how many kg sand is requried for plastring in 100 sqft?
Answer Posted / divusp
area 100sft=9.29 sqm
normaly thickness of plastering=12mm(in special condition it may vary)
Qty of wet mortar= 0.112cum
for dry mortar + frog joint add= 40%
so total dry mortar qty=0.1568cum
plastering usually =1:4
and if any ratio also sand qty=dry mortar qty
sand=0.1568 cum
sand bulk density= 1500kg/cum
so sand qty is 1500x0.1568=235.2kg
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
04. a. Slenderness ratio…………… 1 b. If the height of a stage is 15-0 & dia. of the prop is 5, the slenderness ratio is….… 1 c. If the height of a stage is 10-0 & dia of prop is 3, the number of bracing will be…… 1
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
What are the composition of a landfill?
why development length = 50D . why not 100D
How to do rate analysis for concrete work including shuttering work?
For what purpose bedding is used under storm water drains?
what is the formula for Mass of cement grout (Dg)=???
do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?
define the strength
How many bricks are there in 100cft?
what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?
What is oneside mat. And explain
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
What is the difference between chamfer and fillet?