9*8m slab 1:2:4 ratio use for M20 mix how much cent is
require it will become in cum but i want bags.
Answer Posted / sundarapandiyan
Bulk material qty for one cum conc=1.52 cum(using 20mm and lesser size aggrigate)
Concrete ratio 1:2:4 = 7 part
cement =1 part
for 9x8m = 72 sqm
assume thickness as =100mm
so cc qty=9X8x0.1=7.2 cum
cement= (7.2x1x1.52)/(1+2+4)=1.563 cum
bulk cement density= 1440 kg ( for clarification cement density mean specific gravity =3.15 mean 3150kg /cum)
so cement in kg=1440X1.563 =2250.72kg
cement in bag= 2250.72/50=45.014 bag can assume as 45 bag.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what do you know that m20,m25
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
Is it possible to make a feature using an overdefined sketch?
What you understand by building codes?
What is costing in 100squre feet bricks
explain five benefits of using standard terminology in the measurement process?
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
what are the values of compressieve strenght?
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
what is tension & compression of steel bending.
How to calculate the force on a column of three story building. What should be the base concrete height?.
how to preaper for interview wat they asked in interview give me idea
How to come 1.54 from dry to wet concrete?
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''