What is the Cement: sand: aggregate: water ratio for grade
30 (G30) concrete.
Answer Posted / baipalli inod kumar
take the ratio 1:1.5:3
cement =1
sand =1.5
metal =3
So what is the ratio we want to mixing 1+1.5+3=5.5
Volum of wet cement concret is 1.54 to 1.57
unit weight of cement bag is 1440 kg/cum
one bag of cement = 50/1440 = 0.034722 cum
SOLUTION : CEMENT = 1.54/5.5 =0.28
=0.28/0.0347 = 8.069 ( 8 bags)
one bag of cement =50 kg X 8.069 = 403.45 kgs.
SAND solution =0.28 X 1.5 = 0.42 Cum
1.5 is the mixing proportion
METAL SOLUTION = 0.28 x 3 = 0.84 cUM.
3 is the mixing proportion
1 Cum cement concrete is 1:1.5:3 ratio
cement = 403.45 kgs.
sand = 0.42 Cum.
metal = 0.84 Cum.
| Is This Answer Correct ? | 2 Yes | 4 No |
Post New Answer View All Answers
pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width
what is mc arther pile?
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm
What is the density of Fiber reinforced concrete and give me the which fibers we can use in Concrete?
What are the different types of runners?
What expenses counted in contingencies and how much it is in related to built-up area of the building.
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
what is the formula to find the diagonal shape stirrups?
What is unit weight of normal concrete?
Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
How to calculate cement and river sand material Qty for waterproofing base coat and finish coat
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?