For m25 1:1:2
How to get the quantities of cement,sand,agg for 1cu.mt.
thnks in advnce
Answer Posted / ranjithkumar.t
M25 = 1:1:2 ( for 1 M^3 )
ingredient value of 40mm- 1.52
if you use 40mm aggregate otherwise 20mm aggregate ingredient value is 1.56
cement =1/4*1.52*28.8
= 10.94 bags => say 11 bags
Sand = 1/4*1.52
= 0.38 cubic meter => say 13.4 CFT
Aggregate = 2/4*1.52
= 0.76 cubic meter => say 26.8 CFT
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
What are the uses of layer?
what is the difference between tsp & tower
what is the percentage of silt in black cotton soil.?
Time required for curing of wall tiles before fixing
What is progress payment?
What is rate of concrete surface rendering work per sqm
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
sir how can we find the cement and sand required for making 4" drop
What are the applications of cad?
how to calculate rate analysys of 1:6 plastering 10 sq m
what will be density of a cement bag if its weight and volume are 50kg and 1.25 cft respectively???????
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
How to calculate the quantity of ingredients of M20 grade concrete?
what is m30 in concrete tiles
Define What is an ice dam sock?