What is RTCC panel and why it is required
Answer Posted / edwin aguinaldo
RTCC is REMOTE - TAP -CHANGER - CUBICLE and composed of AVR automatic voltage regulator which regulate the incoming supply voltage from the transformer using VT or voltage transformer (voltage ratio). RTCC control the MDU motor drive unit which control the OLTC on line tap changer position giving number of step + or - ,OLTC is connected to multi tap winding of HV side of the transformer.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
In PFI plant one stage capacitor connection is directly connected(with out megnetic contact controll). but why?
why lightning arrestor are made in two stack of insulator but why not cvt
placement paper samples of mspl company
Can Anyone Answer anyone of these ? Q1) why direct SOLUTION of Load Flow Studies in Not Possile ? Q2)Why majority of Buses in power system are load buses Q3)Why one of the buses in Power system is taken as reference bus (slack or swing) Bus ? Q4)Bus Admittance Matrix is a sparce (means it contains some zero elements ) matrix , give reason
hi this is hema can anyone mail me previous years questions for the APPSC-A.E.E (in electrical stream.) ......thank u.
What are the ratings of VCB, MCB, MCCB, SF6, ACB, and OCB?
Dear All we are having a problem in G120 BOP showing alarm A0503, F0052, F0060 we can not remove fault alarm ,Please any body help us. kowsar
Electrical Engineering
In a Impedance Based Distance Relay (Quad Characteristics) - Could there be two different Line Angle(RCA) for Ph-Ph & Ph-Gnd? If So Kindly Let me Know.. Where, What are the advantages of the same?
what is a reactive power? what is the relation with power factor?
I NEED RRB APTITUDE QUESTIONS AND MODEL PAPER,PLEASE SEND MY E-MAIL joo28_eee@yahoo.co.in
How to calculate VCB rating for 33KV ,25 MW Power line?
what is mean by restructuring power system?
1)how to reduce the value of tan delta of trasformer and CB,bushing,CT&PT,CVT ? 2)how to reduce the resistance of CB contact and its operating time? 3)plz.....send me the project report on conditioning and monitoring of substation equipment on my email id (gusaiyogendra03@gmail.com)
sir please send me iocl written test paper in my e-mail account. i'll be obliged to you........ thank u roshan