what is periode of deshuttering of slab our span length
21m,and width 2.5m grade of concrete M-35

Answer Posted / sliajit dasgupta

Minimum 7 days, maximum 21 days

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why building got air crack? if it get in one particular are what is means?

1949


What is M40 _ TOR - EQ and B.F.S

2021


What does civil status mean?

681


How to do rate analysis for concrete work including shuttering work?

1553


What is the difference between a wood shake and wood shingles?

697






find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.

1806


Define What is aggregate?

699


what is tension & compression of steel bending.

1835


Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com

1537


Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?

691


How will be cutting in timber plate size 600*400 column size

1233


What is the strength of 1:6:12 mix?

2596


What are some facts about concrete?

662


Explain major differences between routing maintenance and major maintenance.

656


CAN WORK WELL UNDER DEAD LINES OR PRESSURE?

1494