what is periode of deshuttering of slab our span length
21m,and width 2.5m grade of concrete M-35
Answer Posted / sliajit dasgupta
Minimum 7 days, maximum 21 days
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
why building got air crack? if it get in one particular are what is means?
What is M40 _ TOR - EQ and B.F.S
What does civil status mean?
How to do rate analysis for concrete work including shuttering work?
What is the difference between a wood shake and wood shingles?
find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
Define What is aggregate?
what is tension & compression of steel bending.
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com
Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?
How will be cutting in timber plate size 600*400 column size
What is the strength of 1:6:12 mix?
What are some facts about concrete?
Explain major differences between routing maintenance and major maintenance.
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?