Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to calculate load requirement of a 50 flat apartment with 5 kw each unit,sizing of cable,transformer

Answer Posted / abdul rahman

Each unit as in each flat 5kw ?? That would be 250kw for 50 flats.
250kw into 1.8 would be total current = 450amps
Cable sizing Acc to Dubai STDs for 450amps would be 
2runs x 4C 150sq.mm Cu + 1C 150sq.mm ECC 

Transformer sizing u need to take into account 20-25% future use efficiency of t/f and diversity factor

So for 250kw it would be 250x1.2x.8/.9 nearly 300kva transformer.

Is This Answer Correct ?    4 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

hello friends.. I have a doubt regarding the operation of dc machines.. I studied in a text book that a dc machine can be used as a generator and as a motor.. is this possible? If so,please send me the info about this topic.. you can also send your info to my mail.

2060


features of hbc fuses

2422


how wecalculate breaking capcity of acb mcb mccb .explain with example

1937


What is Tachometer used to measure?

1251


How to Preparation of online test

1693


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1796


Assuming that a dedicated neutral earthing transformer is provided for each GT generator, when the two generators are running in parallel, has consideration been given that the earth fault current from one generator stator winding be split between the two neutral earthing transformers? If so, what adverse impact will this have on the operation of the 59N and 27TN devices?

1659


What is the differance between 2 dc motors of armature voltage 660 v and 440 v?

1985


Can we use BS 6651 and BS EN 62305 standards for computer room lightning ptotection in substation?

2257


In a large office how do we calculate required number of light fittings, assuming fittings are 4x18W or 2x36W fluorescent fitting ?

1876


if you are in a software company,then why do you want to come in a core company like sail, ntpc(where lots of trouble like tension but you have a good life in a it company) ?

1908


how to conduct dc resistance test for rotor of an alternator and how to measure the rotor dc resistance value theoritically?

3294


solar inverters was not connected to the nuteral link .this nutwral possible to any other systems

1883


What is the function of interposing current transformer?

1057


Whether 3 phase induction motorwith 100 hp capacity , Amp 160 for which sensitive earth fault relay , type CTUM 15 can be used?

1510