how to calculate 1:1.5:3 ratio concrete cement, sand, metal
and water please give me brief calculation
Answer Posted / sunil notiyal
M20 = 1:1.5:3
Volume = 1+1.5+3=5.5
Total volume ingredients for using =1.57
Volume of broken stone Require = (3/5.5) x 1.57 = 0.856 m3
Volume of sand Require = (1.5/5.5) x 1.57 = 0.471 m3
Volume of cement = (1/5.5) x 1.57 = 0.285 m3
= 0.285 x1440 = 411 kg
For 1m3 of M20 (1:1.5:3)
Broken stone = 0.856 m3
Sand = 0.472 m3
Cement = 8.22 bag
| Is This Answer Correct ? | 27 Yes | 8 No |
Post New Answer View All Answers
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy
Which is the best book for building construction?
how to check and keep control on the wastage of material at site
what is column foundation
What is the Roll of Water Bonding under VDF road?
what is meant by residual strain?
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?
for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area
Which is stronger solid steel rod or hollow steel pipe?
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement
The portion of a brick cut across the width is called?
how much of the strength comes from post-production curing
WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?