how to calculate 1:1.5:3 ratio concrete cement, sand, metal
and water please give me brief calculation

Answer Posted / sunil notiyal

M20 = 1:1.5:3
Volume = 1+1.5+3=5.5
Total volume ingredients for using =1.57
Volume of broken stone Require = (3/5.5) x 1.57 = 0.856 m3
Volume of sand Require = (1.5/5.5) x 1.57 = 0.471 m3
Volume of cement = (1/5.5) x 1.57 = 0.285 m3
= 0.285 x1440 = 411 kg

For 1m3 of M20 (1:1.5:3)
Broken stone = 0.856 m3
Sand = 0.472 m3
Cement = 8.22 bag

Is This Answer Correct ?    27 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.

1491


types of laps in column

1913


Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?

1396


In case if concrete box girder bridges how is the number of cells determined?

709


How u can calculate the Octagon ring distance from center of raft in 275 mtr chimney slipform errection? cantact no:0993455097

1755






how we calculate the grade of the Bituminous materials.?????

1827


i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh

1835


Where is the worlds longest elevator and how long is it?

690


How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?

1247


. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.

1950


what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?

2102


if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?

1503


What do you mean by tolerance factor of concrete ?

2669


what is floating slab foundation?

669


Can inverted beams used in pipes during construction? If yes, explain how it can be implemented?

886