what are the major duties
of a instrumentation
engineer in a power plant.?

Answer Posted / kashan

There is difference between Instrument Engineer & Instrument Technician.. but Engineer must be a good technician ... As an engineer your responsibilities are to trace the fault , trouble shoot it asap. you must have strong grip on instruments such as RTDs, Thermocouple, Sensors, PLC's, Transmitter etc,so that you can rectify the faults.  Once fault get rectify , Engineer major responsibility is to prepare a report and forward it to Manager whoever is your senior.

Is This Answer Correct ?    5 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the trip circuit supervision in an electrical meaning?

1431


What is surging in a centrifugal compressor ? How it occur's ? How is antisurging done ?

1926


Why superheated are started before I'd and rd fan?

1686


why do you consider yourself a suitable candidate for this position

6968


our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....

1189






DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

507


how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?

1224


dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job

2062


explain how the third harmonic content of the magnetising current affects transformer design

2763


How to calculate power press toneage

1538


what is natural frequency of turbine shaft .

1711


can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525

1272


what is restricted earth fault explain in details

1621


operation

1364


How do you consider that you can improve and what assistance do you need to achieve this

1327