how to calculate rate analysis of M25 grade concrete
Answer Posted / mandamalaki
M25=1:1:2
one bag cement = 50 Kg
Density of cement=1440
one bag cement =50*1440=0.034 cum
one cum dry volume cement =1.52
total ratio=1+1+2= 4
Dry volume of cement/ Ratio
=1.52/4= 0.38
cement=1*0.38=0.38
require cement in bags=0.38/0.034(1 bag cement volume)
=11.17 bags
Sand=0.38 cum
stone chip=.38*2= 0.76 cum
Note
*The rates may vary depends on location
| Is This Answer Correct ? | 78 Yes | 21 No |
Post New Answer View All Answers
what is density of 20mm coarse aggregate.plz send answer my below adress e.mail
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
how much cement and sand required for 1cum rr masonry
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
How do you maintain water pressure?
What are the different methods for drawing an arc?
what is the difference between np2 and np3 concrete mix
Different sizes of Hollow blocks and its weight. Thanks.
60-70 grade of Bitumen is VG-30 ?
Who designed the city of washington dc?
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
Which are the top apps for you civil engineer?
How to find beam R/F cutting length
Why should appointment store person for project ? what is the benefits for company ?
What is modular elasticity?