what is the procedure to isolate flow a transmitter and
flushing it?
Answer Posted / abu khaled
1-close the high side valve from manifold
2- open the equalising valve
3- close the low side valve
4- close the equalising valve
5- be careful do not open the three valve in the same time
to avoid damage sensore or cabsoule .sometimes the prosses high temperture or cmical can damege cabsoule>
or maybe there is seale liqude in the high and low side
6- open the vent for low side to zerw check and be sure the equalier valve is closed .
7- if need calibration use high side connections
8- after being sure the TX is oky go to next step
9- make flashing to both sides high and low if they are blugged aske operator to isolate from orfice plate and aske piping group to flash tow lines
10-to return the TX to servse
11- open equalising
12- open the low side
13- close the equalsing
14- open the high side
| Is This Answer Correct ? | 8 Yes | 11 No |
Post New Answer View All Answers
I faced several time siemens ps2 positioner automatically getting Chang in it's set point direction after auto calibration So is there any causes biside this or any permissives ?
selection of the zener barrier for the hazardeous area zone 0
please can any one tell me clearly about pid tuning i am confusing about this .how to tune pid easly?
can u plz send me technical questions asked in SCHNEIDER ELECTRICAL technical paper?
can any one tell me when ongc placement test and its forms is available????/ pls tell me if u know
can anyone tell me about the basic concepts to consider before to start a PLC panel wiring
where proximity sensor installed on tank in loading arm application
who's take first position in process in the timing of new installation flow transmitter and control vavle. give the answer with logical trick.
explain key exchanges in all security modes WPA,WPA2,TLS?
when the instrument tapping on pipe line is located below and transmitter is located above the tapping point for liquid service transmitter, what should we do, is there any additional drain valve is required??
POSSITIVE PULSE IS APPLIED TO AN INVERTER INPUT.THE TIME FROM THE LEADING EDGE OF THE INPUT TO THE LEADING EDGE OF THE OUTPUT IS 10 ns. THE TIME FROM THE TRAILING EDGE OF THE INPUT TO THE TRYLING EDGE OF THE OUTPUT IS 8 ns. WHAT ARE THE VALUES OF tPLH and tPHL?
Describe a time when you anticipated potential problems and developed preventive measures.
What is intrinsically safe system?
what is temperature compensation?
How to fix back the valve actuator stem