Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is difference b/w tube and pipe ?

Answer Posted / ayaz

this is main difference
TUBE= when temperature high outer dia constant and inner dia expand
of tube
PIPE= pipe temperature high the inner dia constant and outer dia will be extended 

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How can i test procedure grounding for CAT-7 cable? Or How can we test procedure CAT-7 Cable Electrically safe?

2960


how to calibrate mass flow meter (Coriolis)? Example calibration range: 0 to 2500 kg/hr line size 3" fluid: Etheline glycol (MEG)

2685


If a control valve is hunting means means if we are giving 50% to the cv, the cv will open at 51% then slowly slwoly it will reaches 49% , so what to do for solve this problem. The cv is double acting and mounted for anti surge operation, it having 4 nos. volume booster, one sov, one positioner, etc..?

2100


Regarding , there is an air cooler which control the fans(50% of AV FANS) by temperature in outlet , and the louver of Air cooler is controlled by HIC from control system , So if on Air cooler we will consider 2 individual I/P converter or positioner?

1764


Why MUX JB's are using only Temperature Element in Fundation field bus?

2336


how to calibrate load cell

2840


What should be the main consideration while starting the Rotating compressor when we dont know the cut in and the cut off pressure setting of the pressure switch

2216


1.what is the power consumption of three element drum level control in sugar industries? 2.how to reduce that?

1647


steps for installing orifice plate?

1853


Calibration procedure for water rotameters

2195


Why is it necessary to use compensation leg to measure the liquid level in a closed or pressurized tank?

2466


What happen if I install my pressure transmitter below the elevation of pipe in natural gas service?

1203


how to calibrate steam control valve in steam turbine

3332


I want to buy a seal kit of a pneumatic power cylinder.But I don't know it's specification.So please help me to know its specification.

1946


If i have 4 Allen Bradely make RS logix 5000 PLC and for viewing that we are using 4 RS view SCADA for 4 different packages. Now, I will want to view two packages on only one SCADA. Then how i will do it?

2385