why we use reduction gear box to reduce turbine high rpm to 1500 rpm in small plant
Answer Posted / keyur donga
As we know our design of the turbine is more than 1500 rpn ,like 6500,7000.and generator designed at 1500
rpm,
when we use the turbine Which is rotate 1500 RPM Which is not able to create the torque,
So we use the reduction gear ,Which is rotate the at 1500 rpm
& Able to create the torque.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
what is the meaning of SST300 V56A in SIEMENS turbine
why do you consider yourself a suitable candidate for this position
what is natural frequency of turbine shaft .
can dp type level transmitter work in under vaccum condition
We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?
By any way can we increase the B check hours from 300 to 500
dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job
How do you consider that you can improve and what assistance do you need to achieve this
what is restricted earth fault explain in details
explain how the third harmonic content of the magnetising current affects transformer design
What is LB-SR.
can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525
how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?
How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.
Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon