Answer Posted / tyrkrv83
PM: Preventive Maintenance is Routine check up in very clear very planned every 6 months or 3 months and do the routine check up as calibration,testing, servicing.
CM: unexpected error to be rectified.
RCM: is a process to ensure that assets continue to do what their users require in their present operating context.
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
how many types of preheaters are in cement industry & what r they can any body explain?
Why do we floating DC in DC system.
what should he know if he is an assitent engineer instrumentation in cement industries of experience of 10 - 15 year.
Decibel.
What is 3 selection available when configure the burnout protection for controller
how can leve transmetter calibate in feild .and also put cv and flow plz .....
wich is coming the first HAZOP OR SIL
Speedtronic system .
What is the calibration procedure of Drum level transmitter if range is 0 to -400 mmh2o in lab?
What are the maximum packet size of: a) HART b) Profibus DP c)Profibus PA d) DeviceNet e) Foundation Fieldbus
In my company plc based winders are operated. one day there was a data transmission failure alarm shown on pc. as per sir instruction we have reset master plc but winders were not triped and alarm gone. so what master plc do?
I am having a Phoenix digital to modbus converter. The o/p of the same is connected to flow computer FB407. But the digital signals are updated only after one minute in the flow computer. what may be the cause of delay in communication? Flow computer is having a scanning period of less than 1 sec.
why we take %i0.0 as input for twido plc
What is the use of double seated valve?
this site is owned by an nonsense