"Why you consider yourself suitable for the post"
Answer Posted / srinivas
I believe that my knowledge, attribute, skills, working
experience, and inspiration that the position required
makes me suitable candidate for this post. I can
confidently carry out the task mentioned in your job
description. I consider myself a committed team player who
also relishes challenges and readily assumes responsibility
and accountability in a personal performance role where
initiative is vital. The software expertise gave me a good
foundation to build on. I can add value and make a
worthwhile contribution to the company’s growth with
technical essentials which I have gained during my past
service career. My attitude and temperament best suits the
nature of the job. And therefore, I am eager to enter in a
new working environment. I would like the opportunity to
contribute to the efficient operation of a well known
company and to earn advancement through on-the-job
performance.
| Is This Answer Correct ? | 69 Yes | 18 No |
Post New Answer View All Answers
how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
how much cement sand n bricks required in im3?and how much in plaster?
Define What materials were used to build the Golden Gate Bridge?
Explain the design for rcc multi-storied building?
In case if concrete box girder bridges how is the number of cells determined?
what discoveries did you have in relation to your course?
is basic cost of the material includes tax?
strength vs shape factor
What is Architect-Prepared Contract?
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
How much cement will require for 1Rmt Skirting laying
What is the release of lien?
how we calculate the vol.of wet concrete..?
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?