which grade of cement is more suitable for construction..? and why.?? what is difference between 33, 43 and 53 grade cement..?

Answer Posted / srav

*33 Grade OPC is used for general construction works like plastering and finishing works in normal environmental conditions. However, its use is virtually phased out today.

*Coming to the 43 Grade OPC, it is the most commonly used grade for home construction. It has its applications in plastering, finishing works, precast items, foundations, brick work, and compound wall and so on. It has more strength development than the 33 grade cement.

*53 Grade OPC develops strength very fast. High rise building constructions use 53 grade cement. This is applicable for use in structures where high grade concrete is required

Is This Answer Correct ?    10 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?

6339


States some of the tool bars used in cad?

662


what are the values of compressieve strenght?

1587


List out some of the software program that can be useful for architect?

672


why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?

2749






For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?

1478


i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like

1539


Draw the cross section of a boundary wall and label its part with detailing?

4141


what r the precaution for high in atp tempareture,low in atp tempareture

1577


what is the hanekom repairing material after concreting work

1912


how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?

1603


how to calculate rate analysys of 1:6 plastering 10 sq m

2500


My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).

2605


HOw much % of premium on DSR-2013 currently

1528


Advantage of Aluminum form work in terms of activities can be skip and cost too