what is the formula to calculate isolated footing
Answer Posted / partha pratim panja
{(A1+A2)/2}X H/2
| Is This Answer Correct ? | 11 Yes | 10 No |
Post New Answer View All Answers
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
115mm thickness brick work how to required mortar
What are the uses of layer?
how will remove spiderweb cracking in plaster ? what the reasone of make it ?
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
Cement consumption of one cubic meter of aerocon blocks masonry?
Explain soil analysis?
What is modular elasticity?
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
If specific gravity of cement is less than 3.15 what is the cause?
how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.
For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?
how to disign cuplock shuttering and it's matireal requirement snd any related web site