Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

WHY TRANSFORMER IS MEASURED IN KVA?

Answer Posted / naresh

Because power factor of the load is unknown that's why transformer measure in kva

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

defination of lines

1979


What are capacitive,resistive,inductive surge absorbation? What is ferranti surge absorber? What is lagrangian cost? What is Px operator?

1986


explain transformer ct connection?

2041


What mean by MLTP

3931


How time response of the system is divided?

1173


What is the comparison of PILC and XLPE cable

2099


i have faced a problem in ro plant grunfos make bm30type pump it is 22kw pump. We start this pump using siemens 3rw 4423-ibc44, 30kw softstarter but this soft starter will frequently failier so we planed to change dol starter. So pls tell anybudy its possible or not.

1913


What are the main parts of central chiller plant? Explain the function of each stage.

4782


Is it possible to use a S1 duty class motor for crane application (S4)? If not, why?

2431


As i want some model question paper in basic computer science and history please send me immediately sir

1858


What will happen if the voltage in my house drops from 220V to any lower voltage?

2175


Briefly describe your ideal job?

2955


what is the constructional difference between a power transformer and potentian transformer?

1741


I have 2500KVA transformer delta/star,13.8KV/380V provided with LV 4000A breaker. Already I have 2300KW motor feeder with a full load 90%. Is it possible to connect another 1600A from that breaker? If so how the calculation is done?

3797


I have iti elec, 1st aid, and 5 yrs experience in 7.5 mw power plant. Am i eligeble for 11kv license in telangana state..when, how to apply for that.?

2291