Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is BMS (Building Managment System)& is AHU / HVAC are
in BMS.

Answer Posted / mohammed mujakar ( gulbarga, k

Dear Sathis,

First Look at Question i.e. What is BMS (Building Managment System)& is AHU / HVAC are in BMS. (not Burner Managment System)

BMS stands in diffrent form in diffrent feilds like BMS also stans for Buissiness Management System so on.

Ans:
Building Managment System is a Automated Controlled based system which instaled in Building/Shopping mall/ Buisness Centre etc. to Operate ,Controll and Monitore the
buildings Electrical and Mechanicle Equipment including Fire Alarm system, Access control, CCTV systems, Boilers trough monitoring system (Personel Comuter).

Is This Answer Correct ?    28 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calibrate H2s Dectector

1674


Describe the typical instrumentation used in monitoring the performance of a shell and tube heat exchanger.

2121


protection relay watchdog contact operation?

2004


WHAT IS THE DIFF. BETWEEN SKIN TEMPERATURE AND PASSES TEMPERATURE..?

2576


any body who gone thru recent iocl interview.INSTRUMENTATION questions. I need.

2538


why we use impulse line of flow transmitter at 45 deg. angle both side of orifice plate.

2448


What is the reason PT speed not incresed in gas turbine?

2449


I m appointed as an automation trainee engineer in small firm in that I am only the one , my company give me a project on s7-200 as i m beginner I don't know how to program so please send me the helpful site so that I complete my project before deadline....please help me out in this critical situation.

2036


What is the differerence between hysterisis and linearity.

2366


Why boiler chimney area  oxyden sensor fixing? 

2556


How to decrease opening & closing time of on/off valve?

1549


Q1: Consider part of a control loop, which excludes the transmitter, consisting of a process, a controller and a control valve which may be represented by two dead times of 0.5 min each and three exponential lags of 0.8 min., 1.0 min. and 1.5 min. respectively. We wish to express this system as an overall first order plus dead time (FOPLD) model ie gain, time constant and process dead time. (We will see later that this is often done, to simplify controller tuning). For this exercise, gain is considered to be 1.0. (A) If the transmitter is a flow transmitter whose behaviour can be described by a dead time of 0.2 min. and an exponential lag of 0.5 min. in terms of the overall dead time and overall first order lag how can the system behaviour be approximated ? Overall dead time = Overall time constant = (B) If the transmitter is a temperature transmitter with a temperature sensor in a protecting well whose behaviour can be described by a dead time of 0.7 min. and an exponential lag of 15 min. how can the overall system behaviour be approximated now? Overall dead time = Overall time constant =

1984


what is maxdna ?. explain about the software details.

4423


who's take first position in process in the timing of new installation flow transmitter and control vavle. give the answer with logical trick.

5285


Tell about your IFFCO plant visit.

2128