shuttering consumption per square feet in multi storeyed
building?
Answer Posted / shiva
Ax0.125m=1cum
A=8Sqm
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?
i want texture painting pwd data
it is a corrected question." make a list of engineering property(properties) of soil.
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
115mm thickness brick work how to required mortar
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
What is the material consumption- cement,sand,tiles etc for Toilet dado?
Is there any course for billing available in Mumbai? If yes then please mail me the details..
Explain the design for rcc multi-storied building?
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
what are the challenges of being a team leader and a supervisor?
What are the problems one might face while having a Cantilever balcony?
What glue is least sticky?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?