Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to calclate the cemment for 1 cubic metre of 1:2:4 concrete

Answer Posted / khan9219362784

1 cum of 1:1:4 concrete 
Dry volume equal is 1.52 
Cement equal is 1/6*28.8*1.52 =7.2 bags cements
        = 364.8 kg cements 

Is This Answer Correct ?    0 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m

2249


how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?

2126


construction workers how much time take one work or qty

1888


please briefly explain calculating or estimating steel quantity for a RCC column?

2026


why we create short columns under grade slab?

2362


What is specific gravity???

1496


How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?

8067


how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.

2146


What is critical path method (c.p.m)?

1202


water leak detection system question & answer

2499


what is mc arther pile?

2305


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2214


how to caluclate sienerge qty in construction in ap

2452


What is Architect-Prepared Contract?

1234


What is type failure of road surface? how to repair the failure of road surface?

2533