Unit- 1sqm ; take 100sqm
Qty of mortar req to plaster wall= 100sqm x .015m=1.5cum
To make up for uneveness inc by 30% = 1.5+ (1.5x30)/100= 1.95cum
Inc by 25% the total dry volume = 1.95+ (1.95x30)/100
= 2.34 cum
for 1:4 cement sand mortar (Assumed)
Cement = 2.34/(1+4)= 0.468cum
Sand = 0.468 x 4= 1.872cum
Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
how calculate the bearing from two coordinates?
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
What are the basic use of runners and standards of pipelines?
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
What is .Dwg?
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
what is civil all interview questions
Prepare a Schedule for a Highrised building from starting stage to Handover?
Define Workability ?
how much need sand and cement for 1 cft roof construction?
What is the strength of 1:6:12 mix?
How much time Required for PPR pipe network testing
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
Does brick grows bigger every year?
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??