How to Determine the Quantity of Cement Sand , Aggregete
and Reinforcement Bars in 30 feet X 40 Feet and Height is 4
Feet .
Answer Posted / prabu
1 feet = 0.3048 meter
30'*40'*4' = 9.144 *12.192 * 1.2192 meter
total volume = 135.92 meter cubic
1 bag cement = 50 kgs
unit wt of cement = 1440 kg/m3
density = weight/volume = 50/1440 = 0.0347m3
if concrete grade is M20 and ratio is 1:1:2
1+1+2 = 4
cement = 135.92/4 = 33.98
33.98/0.0347 = 979.25 bags
1 cement bag = 50 kgs, so
979.25 bag = 979.25 * 50 = 48962.53 kgs
sand = 1* 33.98 = 33.98 m3
aggregate = 2*33.98 = 67.96 m3
for slab = 0.7 -1% of concrete volume (reinforcement provided )
for beam = 1 - 3%
for column = 1 - 5 %
for footing = 0.8 - 8%
in this problem = 135.92 m3 concrete
for slab = 135.92 * 0.007 = 0.95m3 volume reinforcement provided.
ans =
cement = 48962.53 kgs or 979.25 bags
sand = 33.98 m3
aggregate = 67.96 m3
for slab = 0.95m3 volume reinforcement provide
| Is This Answer Correct ? | 9 Yes | 5 No |
Post New Answer View All Answers
What is hybrid foundation?
Process of pcc in wateredug
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
how meny typs of renging rod?
why is the column design?
Explain the different types of building contracts?
what is the procedure of wet seiving. n percentage of silt in different type of soil?
I what know about life time of frp tank plz explain about it specifications & other details
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
Why nautical mile is different from statute mile?