Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

12 mm dia not available at site for raft, 10 mm are available at site how to calculate?

Answer Posted / ameen salim

Measurements of slab and spacing of 12mm steel is not Mentioned in your question,

At first you have to calculate area of steel (Ast) designed by the structural engineer for that particular area (from structural drawing you can calculate). Then placed the 10 mm steel instead of 12 mm steel as per Ast you got.

Note:
Adjust the spacing as per Number of steel (10 mm) you have to placed as per calculation.

Is This Answer Correct ?    3 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Howmuch bend to be provide for 200/600 BEEM

1615


Define relative co-ordinates?

1145


What black man invented the clothes dryer?

1097


What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)

2512


what is relation between SPT N value and driving piles after conducting a soil test?

2198


Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.

3491


brickwork labour rate per cum ?

1629


As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.

1920


Prepare a Schedule for a Highrised building from starting stage to Handover?

1987


plumbing CPVC fitting FTE Brass full form

2702


explain what do you mean by the property development.

2098


How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?

1995


How is calculate the cube molt

2281


what values & beliefs have guided you in your career path

3295


why top layer of block work shoud be full size if any cut block adjustable than another layer?

2205