How you identified whether this order is make to order or maket to stock in Order Level ?
Answer Posted / swamy
it's based on the strategy group in the material master
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
Give examples for standard output types in sd.
In a material master what is the base unit?
How do I change this?
can one have multiple packing for delivery? answer is yes , but where we maintain this? wt is the process?
What is item category? How can we assign it?
What sap systems have integration capabilities with sap transportation management? : transportation management
Name at least five features that you can control for the schedule line category? Relevance for delivery, availability check, transfer of requirements, goods movement, purchasing and incompletion log.
What copy control is and when copy control transition can be done? In what manner copy control transition can be done?
Explain what is condition types?
What are the important 'customer master records'?
What are the various qualifier option or what are the various import options? : transportation management
Explain the term "as is" ?
Can anyone walk me through the process of what happened when you do the post good issue in delivery? Moment type 601, let’s take that as an example, what happened in SAP? Suppose 601-moment type is posted in SAP, what happened when you do PGI (Post Goods Issue) as any account happens and if yes then what kind of account posting happens. please tell me, after PGI is completed what happens?
I was faced these interview questions, please provide answer with your real life experience SAP gurus. 1. As a SAP SD consultant how did you integrate/interact with MM and FI/CO? 2. Tell me about your OTC process expreience? 3. How have you used MASS tool in your last project, and to upgrade what data? 4. Tell me about your EDI/IDOC experience? PLease answer any/all questions as per your wish. Thank you very much in advance, god bless.
If question will arrise that are you any project,because I am a fresher in sd but I have shown 1 yr of experience. So can I say I'm in implementation or support project?