what are the advantages and disadvantages of waterfall model?
Answer Posted / arif
DisAdvatages
1. Inflexible partitioning of the project into distinct
stages makes it difficult to respond to changing customer
requirements.
2. The lifecycle can take so long that the original
requirements may no longer be valid by the time the system
is implemented.
3. Estimating time and costs is difficult for each
stage.
| Is This Answer Correct ? | 125 Yes | 25 No |
Post New Answer View All Answers
What is a bug triage?
Explain Single View Testing ?
What is an inspection in software testing?
do we require any scripting languae to write test cases in test director? what for it is used?it is like back end?only database we can there?
Hi, i am looking job in perfomance testing using Loadrunner can any body help me a project in any domine plz(Usah) chs_29@rediffmail.com
How to explain the Insurance project in the interview?
Give me sample test cases for smoke testing
What is localization testing (l10n testing)?
Information about Automated Software Installer
what is the diff. bw separate database testers and manual testers with sql knowledge guys... iam confusing so much ,,in cmpny database testers are not working on manual..? both positions are same are not? explian clesly with example? thank u
What are the factors affecting a manual testing project and what are the ways to overcome it?
Can you explain the workbench concept?
Write positive and negative test cases for forgot password?
how to generate id in testdirector? a) Td id 1 b) td id 2 c) td id 3 d) td id 4 which is correct answer please any one of the tell me and mail me
1)can u tell me, what is the roles and responsibles for database tester in DB testing from requirement stage to UAT stage....2) what are the i/p documents he wants and who wil give the i/p docs. to DB tester.and tell me what exactly db test case means what?