Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

I have a close vessel tank which is under vaccum when in running condition so pl. Provide it's range for dp type tx whose flange to flange distance is 440 mm and density is 1

Answer Posted / carl_ellis

A closed pressure vessel requires a differential pressure
measurement in order to compensate for the pressure or
vacuum in the vapor space above the liquid.

The density is said to be 1, so we'll assume that what was
really meant is that the specific gravity is 1.00, the same
as the specific gravity of water. The measurement can be
made in engineering units of mm of water column (wc) with no
compensation for a specific gravity other than water.

A DP transmitter measurement:
(high side pressure) minus (low side pressure)

The low side pressure reading is (vacuum pressure).
The high side pressure reading is (column of water pressure
+ vacuum pressure)

(water column pressure + vacuum pressure) minus vacuum
pressure = water column pressure.

With a vertical elevation difference between the flanges of
440mm, the water column pressure will be
0 - 440mm wc.
LRV = 0.0 mm wc
URV = 440 mm wc

Carl Ellis
Measure First

Is This Answer Correct ?    5 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

on interface level transmitter model(RTG3302-EMERSON) What is threshold valve how can we select correct threshold value T1,T2,T3,T4 When interface water & hydro carbon

2133


HI, can anybody give details about GAS TREATMENT PLANT CONSTRUCTION,as INSTRUMENTATION ENGINEER what are the responsibilites.what are the instruments mainly instrumentation engineer will deal with

2068


I want to know the questions asked in ONGC interview(after being selected in the written exam) for Instrumentation branch.Kindly help.

2247


How to calibrate Toxic gas detector?

1694


please send the drdo exam paper

2371


Q- What are the application in which PNP transistor is preferred over NPN ?

3324


Coal mill Instruments Equipments for cement plant And process diagram ?

2907


Galvanizing.

1938


please send the sample qustion paper for iocl written test ..

3693


why we are using digital signals for I/O & how to measure this signals is getting or not ?

1969


Explain the mechanism behind the turbine meter.

1097


what is the difference between -24 : +24 & 0:24 and where it use?

2053


Capacitance, resistance ( colour coding ), parallel & series circuits.

2205


installation process of orifice,a question asked for confusion creation in interview by BARC 1.if orifice is tightly fitted with pipe ,it will act like venturi 2.if orifice is left hanging in between liquid it will not create the pressure difference exactly,

2117


all types of liquid analyzer principle with drawing?