Answer Posted / m. vijayshankar
In between 40 times to 50 times according to the structural
consultant advise.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Define What is the tensile strength of wood?
What are the main reasons for conducting pull-out tests for soil nails?
Ratio for 4500 psi concrete
How much quantity of rod binding work by a rod binder per day
Slab quantity
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot
what is relation between SPT N value and driving piles after conducting a soil test?
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
Which type of plywood & sizes using in construction projects ?
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
Suppose you planning to paint newly fabricated workshop building made of structural steel of 10 tons total mass. How many litters paint primer for 1 coat and 2 coat of top coat?
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
which formula used for calculate the area of segmental arch?
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
Critical Path Method is...