Answer Posted / m. vijayshankar
In between 40 times to 50 times according to the structural
consultant advise.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
what is the minimum reinforcement provided in beams,footings,slabs? what is the minimum soil bearing capacity to design a multistorey building
I have an span length 16 ft c/c
can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
What is rate of concrete surface rendering work per sqm
i need gate exam civil engineering question papers with answers
Explain the difference between slab and beam?
What are the different types of runners?
IS code for Rolling Margin of steel