How can calculate ups battery back up time?
Answer Posted / cree led street light in pakis
thanks for the useful information you people share
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How to calculate of maximum demand if given 628kw, 785kva, 0.8 p.f.
On what basis the the size of Lightning arrester for buildings are selected ?
Is better to supply the voltage for static exciter from the auxiliary power source or from the SG terminals? And why?
in ring main system we use the isolater b/w transfer bus and main bus if we r not use isolatar than wat will be the effect in our sys.
hi , i have 150 kw loud and we need 50 m cabil,i want to know wich size cabil we use. thanks
what is EIB lighting control system? what is the advantages of this system?
Please provided formula for calculate the cable size from step up transformer to M.V panel, run overhead aluminum cables, total load is 5mega watt, total length 900 feet.
How i can calculate current of cable according to ares?
What is the Surge for 1.1 Phase Induction Motor(For Eg.1Hp) 2.3 Phase Induction Motor(For Eg.1Hp) 3.AirConditioner(For Eg 1Ton) 4.Refrigerator(For Eg 180Ltr or 160kW) 5.Induction Cooker 4. Ceiling Fan
What is Meter MF if External CT Ratio is 150/1 , PT Ratio is 132/110 Meter CT Ratio is 200/1 & Meter PT Ratio is 110/1
What is gain margin?
How is the connection of the tap changer on the HV side been made?
When we use air circuit breaker, it has O/L protection ,time delay SC protection, Instataneous SC protection & ground fault protection. They all have some setting range. But what is the suitable/allowable setting for the above protection which will be safe for the equipment? For example-O/L protection setting have a range of (0.4,0.45,0.5,0.55,0.6,0.65,0.7,0.8,0.9,1.0)xIn Time delay SC protection have a range of (1.25,1.5,2,3,4,6,8,10,12)xIn Time delay setting is 0.02,0.1,0.2,0.3,0.4 Instataneous setting is fixed to 20xIn Gound fault setting is given 100A,300A,600A,900A,1200A This setting are for 2500A ACB. So what will be the basic allowable setting for the above protection? is there any formulae to calculate this<
when it is possible kvrah lead & fundamental kwh be equal in electonic trivector meters (3 ph)
How earthing of switchgear system to be done.