if the length and breath of footing is 1.2m x 1.2 m what
will be the length and breath of foundation trench
Answer Posted / neelam saroj
Am not agree with the above posted answer because,
as we all know you can not dig the exact paper size trench
practically on ground,
so, answer could be = length of Footing + extra pcc length
(if not considered then also its Ok)+ extra digging portion
(depends on excavater for its better working)
= 1.2 + 2 X 0.150 + 2 x 0.300
= 2.1m
So Length/Width of trench = 2.1 X 2.1 m
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What are the responsibilities of a site manager?
Define different types of roof systems?
Explain soil analysis?
explain fie benefits of using standard terminology in the measurement process
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
how i convert mm into standard wire guage (SWG)no.
Which is the latest version of solidsworks?
How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.
What is horizon or horizontal mining?
why is M30 grade Concrete use for Foothing & Column M50
how do you calaculate the total steel quantity of an rcc building using thumb rule?
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
what is Short bored pile foundation.