how to calculate the steel quantity for columns and beams
Answer Posted / dhaval suthar
no of bar x length of bar x unit weight of steel(d2x165)
| Is This Answer Correct ? | 21 Yes | 36 No |
Post New Answer View All Answers
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
what is density of 20mm coarse aggregate.plz send answer my below adress e.mail
which formula used for calculate the area of segmental arch?
What is the method of soil replacement test?
What is thumb rule in quantity and cost estimation of a residential building?
what is conrete grade ,how are depent on concrete grad and size of concrete?
How to cal. The weight of hollow pipe?
why does the most of civil engg is not intersted to going for teaching field?
Is there the dry coefficient of cement is constant?
How many kilo-newtons equals 1000 kilogram?
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
What is M40 _ TOR - EQ and B.F.S
which type of instrument included in plumbing work?name of instrument?