what is the cover used for footings, columns, beams ??? why
they differ & how they arrive??
Answer Posted / dinesh koli
Footing/raft side-75mm top & bottom-50mm
Colmn below gr.level-65mm
Column above gr.level-40mm
Plinth beam top, bottom, side-50mm
floor beam top-25mm, bottom-40mm, side beam>150mm-40mm beam <150mm-25mm
floor slab top & bottom-20mm
Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
what is kribs is supporting?
Which purpose we use deck anchor in bridges?
i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
dialation means
What are the basic use of runners and standards of pipelines?
What is meant by engineering drawing?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
If specific gravity of cement is less than 3.15 what is the cause?
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
what is the name of shuttering oil used in oman
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
what are the layers of the national and heir aprox thickness??
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step