how many safeties should be present in boiler?what are they?

Answer Posted / arun

Totally 9 SV are There
Drum - 3 ( left side-1 , right side-2 )
SH Outlet( MS Line ) - 2
RH Inlet - 1
RH Outlet - 3

This is for BHEL 210MW Boiler

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the meaning of SST300 V56A in SIEMENS turbine

3884


LAPT working in alternator / generator

2543


Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.

1880


im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much

1474


By any way can we increase the B check hours from 300 to 500

1695






our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....

1196


why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.

2762


Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.

2978


what is natural frequency of turbine shaft .

1720


How to calculate power press toneage

1554


We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?

1427


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

512


operation

1373


what is the difference between compensated & normal drum level in boiler drum?

1288


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

1765