what are the major duties
of a instrumentation
engineer in a power plant.?
Answer Posted / sappy
Attaining break down.first check fuse of all auxillary supply. Then check
mechanism and all interlock such as differnt switch .controller
measuring equipments.Al and DI DO
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?
Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon
How to calculate power press toneage
why airtel use + 24 volts and other operators use -48 volt
what is the trip circuit supervision in an electrical meaning?
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
LAPT working in alternator / generator
operation
How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.
By any way can we increase the B check hours from 300 to 500
what is the meaning of SST300 V56A in SIEMENS turbine
Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.
Why superheated are started before I'd and rd fan?
How We Calibrate the vaccum transmitter?