Answer Posted / prabhakar trimukhe
because shuttring space or clear cover between bars and concrete thickness due protect the bars due to corrosion. due my experince
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
Which is the best book for building construction?
Why should you consider yourself fit to be hired by jindal steel.
whaat is blister in box girder bridge and what is its function..
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
sir please send me campus placement questions in civil engineering
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
Which tests are performed on soil to decide the type of foundation to be provided.
what is diversion?
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
What are moment of inertia and its importance in civil engineering?
What is the tallest man made structure in the world?
rimmer in pile foundation
What are the advantages and disadvantages of using plastic and timber fenders?