Answer Posted / md gulfraj alam
sorry sir my english is touch week .. first take a multimeter and set in resistance mode and measure the rtd.if 100 ohm resistance at 0° centigrade then rtd pt-100 is ok near value 99-101 ohm resistance.and same case in pt50,pt25,pt500,pt100 etc only value is isolated of all rtd.otherwise rtd is damage when not match the value..i hope u understanding my ans.thank you
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
what is commisioning procedure,2)what is is the main work in commisioning in the field tx to dcs, plz send me detail
it is possible to check the fail safe condition in pressure transmitter. if possible how?
I am having a Phoenix digital to modbus converter. The o/p of the same is connected to flow computer FB407. But the digital signals are updated only after one minute in the flow computer. what may be the cause of delay in communication? Flow computer is having a scanning period of less than 1 sec.
can u briefly explain aboutan aryton shunt multirange DC ammeter?
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
how to calibrate steam control valve in steam turbine
Why is the orifice tab provided?
Sir, I am working as a Instrument Engineer in Grasim Industries. Can any body provide question answer for interview purpose
is there any digitel grevity meter availaible in the market by which we can measure specific gravity of a battery?
wich is coming the first HAZOP OR SIL
the 3 most common transmitter protocol being in refinery or qatar gas and aramco.
Speedtronic system .
What is the constant voltage unit?
any questions on motor and energy conversions machines?
Instrumentation Safe Guarding test. How to determine the interval time of the test. eg:Halfyearly,Every year,Every three years etc.