You have casted a column above your footing, and you found out
it is off its location by 5cm. What would you Do?
Answer Posted / mkg
We have to go for chemical rebar of total no of steel bars at its proper location.
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
how to identify np3 pipe and np4 pipe
What is structural frames or systems?
How does siphoning work?
how much cost of single coat 20mm thick plastering per sqre meter
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
What is the Unit weight of coarse sand (F.M- 2.20) ?????
Water filter calculation formula
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
For making a new road in a village having a school & hospital , tell the steps of construction systemically ?
how to create our resume?
what is the mix design for M:60 with micro silica andmetakaoline?
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
procedure for preliminary selection of size of column of 5 storey building
Cement consumption of one cubic meter of aerocon blocks masonry?
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6