Answer Posted / harmanpreet singh
two way slab used when L/B ratio is < then 2
where as one way slab is used when L/B ratio is > then 2
Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
Mention what are the composition of a landfill?
What is the cost difference between site mix and ready mix concrete per cubic meter
What is Critical path in Ms-Project ?
Define What are the materials used in building a gravity dam?
how clculate excavated or backfilling quantity by simpson's rule
pile load testing procedure
Process of pcc in wateredug
What is the use of offset command?
how i can tak Quantity of mortar in block work
Minimum and maximum size of the building components
The largest size of paper used in plotter to print the drawing made by Autocad .
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.
Wat is meant by Aecron brick?
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)