Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how many safeties should be present in boiler?what are they?

Answer Posted / pandian

only 6 safety valves used in reheater boilers normally small capacity boiler used 4 safety valves

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what does mean by kva rating

1572


why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.

3312


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

1046


Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.

2471


our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....

1763


explain how the third harmonic content of the magnetising current affects transformer design

3331


what is the trip circuit supervision in an electrical meaning?

2229


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

2565


What is difference between secondary Air & Tertiary Air and Their use.?

2062


what is restricted earth fault explain in details

2105


How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.

2358


Why superheated are started before I'd and rd fan?

2227


What is surging in a centrifugal compressor ? How it occur's ? How is antisurging done ?

2482


why do you consider yourself a suitable candidate for this position

7505


operation

1968