Pls. help.
If a contract was awarded to a contractor in april 2012 with
steel & cement base price as rs. 45/kg & 250/bag. Now in
oct. 12 steel cement price becomes 55/kg & 290/ bag. How
escalation will be calculated? Pls. tell complete calculation
Regards,
Answer Posted / vamsi
Price escalation can done after completing of total work. As per MB the quantity of cement and steel usage have to recorded
and see the prices in the relevant work done month later total all cement qnty and steel qnty and multiply cement in Kgs/Cum using the data.
Mail me i will give u the Price Escalation Format.
vamsi.talari@gmail.com
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What will you do if a portion of load bearing wall collapses under your supervision?
how much of the strength comes from post-production curing
hoe much fine & sourse agregate required for concrete mix of 1: 1.5:3 by volume in Cu.Ft
How to do base isolation using ETABS software?
Why the finite element method is lower bound solution?
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
I need model question papers for writing the Dubai municipality exam,for G+1
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.
what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????
explain the rale of the government in the construction industry
Form where IS456 is adopted in 1978?