In India,we use 230V,50HZ,where as many other countries use
110V,60HZ what r d advantages and disadvantages of each of
them?
Answer Posted / raviranjan singh
as compared to other countries our Indian electronics and electrical circuits are designed on these parameters. and every country has specified by different frequencies and voltages.
Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
Please tell me the power flow from pmg to main rotor of an alternator (Including AVR unit)?
What are capacitive,resistive,inductive surge absorbation? What is ferranti surge absorber? What is lagrangian cost? What is Px operator?
How would your past experience translate into success in this job?
What is the difference between shortcircuit current, rated current of cable & MCB with example? What will be the size of cable required for 5.5 KW motor (Full load current 10 Amps approx.), Starting current with DOL is 120 Amps. Aprrox. Short circuit current with LLLG fault is 2000 Amps Approx.
Explain the following and how these are working with PLC Unit 1 I/O Module Card 2 Adaptor Card 3 Ribbon Adaptor 4 I/O bus 5 I/O Devices
Make a list observation on Transformer?
Why we are going for converter transformers for DC drives application instead of distribution transformer?
How to calculate the heat load for a electrical room
how withstand of hi-pot test outputs of transformer wire 2.5mm
what is the synchronous timer ? and it applications.
why to use freewheeling diode ( diode in revers bias mode) across dc coil
what are the effects when a salient pole alternator is run at high speed like 3000 r.p.m?
What is resonant frequency?
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
what is the voltage regulation for unity and zero power factor?