Answer Posted / dileep
To achieve rolling parameters we are using HP/LP Bypass system and in case of turbine tripped we evacuate residual steam.
Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
What is LB-SR.
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
What is difference between secondary Air & Tertiary Air and Their use.?
what's the moog valve
what is the basic use of power plant in equipment
procedure of how to generate power in solar plant.
dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job
Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.
How to calculate power press toneage
LAPT working in alternator / generator
explain how the third harmonic content of the magnetising current affects transformer design
what does mean by kva rating
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....
How We Calibrate the vaccum transmitter?