Describe control key utility & also standard key ? how many
fields can be configured for standard value key?

Answer Posted / vikram karanth

One way to achieve this is to create another operation step
using the same work center. However this shall be with a
control key that is not a milestone. When the milestone
operation is confirmed, the previous operations up to the
next milestone are automatically confirmed. To get the
desired number of standard values , all the 'non milestone'
steps can be built depending on the need

Is This Answer Correct ?    0 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Have you used Pull list or back flushing in REM?

1544


What are sequence, parallel, overlapping, splitting and where can we assign these

1496


What is meant by payscale structure? How did you configure the payscale structure?

554


What are the reports generated in product cost controlling information system?

610


Suppose the client wants me the vacancy to be displayed on a website as well as ess. How should I do it?

569






Define mrp group

619


What is processing class, where we do them and why?

574


What is time phased Planning?

1277


How can you get planned orders scheduled so that you can do capacity leveling ?

614


Explain Flexible planning Procedure?

1641


Can any body explain me why work scheduling view is required for semi finished and finished products?

573


Explain the lsmw and the steps involved in them.

536


What is MRP Profile and MRP Group?

2273


Which BOM item category you have used?

954


What do you mean by basic dates

515