how do we calculate quantity of cement , sand and
aggregates in 1 m3 of M30 grade concrete ?
Answer Posted / prakash pandiyan
for designing 1m3 concrete of M25 mix the ratio is 1:1:2
for calculating cement,sand and course aggregate ,
for 1m3 add 50% for shrinkage and wastage so 1.5m3
1.5m3/(1+1+2)=.375
density of cement =1440kg/m3=says 1440/50=28.8bags
cement required for this mix=.375*28.8=10.8bags
sand=.375*1=.375m3
course aggregate=.375*2=.75m3
FINALLY WE SAY 10.8 BAGS/M3
| Is This Answer Correct ? | 7 Yes | 3 No |
Post New Answer View All Answers
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
What Reinforcements Are Used In The Process Of Prestressing?
Discuss some applications of modular elasticity?
Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.
How high should the water tank be to provide a 60 psi at base of this water tower?
what is w/c ratio in dry lean concrete for m10 mix design
2. What are the advantages of your present job, things you like about it?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
what are the challenges of being a team leader and a supervisor?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
how do you stabilize a waterlogged area in road construction
Will going from a 3-tap to 6-tap increase water pressure?
how to caliculate required amount of cement and sand required for 1cu.m.
Calculation of curtain wall of box culvert
What is Heavy Concrete & Normal Concrete