Answer Posted / rakesh jangra
its depend on soil test and there zone
normal for rb- 3 to 4 kg /sqf
and for cb- near about 0f 7kg/sqf
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
afe or not
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
How to calculate construction cost of residential building in mumbai
What will be the exam pattern and syllabus for j.e post of haryana staff selection commision? Advt no. (02/2015) Some people says it would only be objective type question papers while others say it would be same as ssc (1 objective,1 conventional) ?? Please answer this question it is needfull to all.
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
How to check slab shuttering level.? Or check list for slab ?
sir, whitch is the best book (writer name) for prepration of gate....
WHAT DLC DESIGN IN CONSTRUCTION
What do you meant by gui?
What is Gsb tollens ?