Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Difference between directional earth fault and
non-directional earth fault

Answer Posted / jerry smith

Directional Earth Fault detection is used to isolate a
fault, when using more than one source of power input.
Current Transformers are used to verify the net sum of
current as zero between any two sources of power. If there
is a fault, the breaker between the power sources is
OPENED. The protection logic will then see if the fault has
cleared. If the fault has cleared, the fault is on the side
with ungrounded power source, and will protection logic
will trip the ungrounded power supply. Conversely if the
fault continues to flow after the bus tie is OPEN, then the
fault is on the side of the grounded power supply, and the
grounded power supply will be tripped.
Non-directional Earth Fault would be a simple fault
detection, as located on a generator neutral.

Is This Answer Correct ?    2 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the basic use of power plant in equipment

1837


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

1044


explain how the third harmonic content of the magnetising current affects transformer design

3327


Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.

2462


By any way can we increase the B check hours from 300 to 500

2250


im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much

2065


LAPT working in alternator / generator

3689


Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.

3464


How do you consider that you can improve and what assistance do you need to achieve this

1796


can dp type level transmitter work in under vaccum condition

2025


why do you consider yourself a suitable candidate for this position

7501


We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?

1973


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

2561


how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?

1749


why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.

3309