Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

The ff slab casted its thickness
100mm.2nd floor slab will be casting its
300 mm.how we shall be given suppot to
that 300mm thk slab.ple way me

Answer Posted / ajay saini

actually this condition is due to failure of planning or due to change in planning.but if you have planning of this type of work you should design the load bearing members according to your building design.

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.

2109


how much to get of BRC lapping in full yield and half yield ?

2536


how much cement sand n bricks required in im3?and how much in plaster?

2538


In the roof of a pumping station explain briefly the components of a waterproofing system?

1157


Define What is the best type of wood glue?

1149


how to estimate material requirement for an area of house in square feet?

2325


What is thumb rule in quantity and cost estimation of a residential building?

3110


how meny typs of renging rod?

2267


what is the types of surveying?which type of survey carrying for type of work?

2173


why building got air crack? if it get in one particular are what is means?

2445


What is Time period of a building and its relation with frequency ?

1438


What is the difference between Fe 500, Fe 500 D and Fe 515.

4062


What is pre-stressed concrete?

1111


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2084


 Describe a time when you anticipated potential problems and developed Preventive measures

3307